DPRM401 QUANTITATIVE METHODS IN PROJECT MANAGEMENT JAN FEB 2026
₹190.00
Match your questions with the sample provided in description
Note: Students should make necessary changes before uploading to avoid similarity issues in Turnitin.
If you need unique assignments
Turnitin similarity between 0 to 20 percent
Price is 700 per assignment
Buy via WhatsApp at 8791514139
Description
| SESSION | JAN-FEB 2026 |
| PROGRAM | MASTER OF BUSINESS ADMINISTRATION (MBA) |
| SEMESTER | IV |
| COURSE CODE & NAME | DPRM401 QUANTITATIVE METHODS IN PROJECT MANAGEMENT |
| Â | Â |
| Â | Â |
Â
Â
Â
Assignment Set – 1
Â
Q.1. Define a project and explain its key characteristics. What are the primary objectives of a project, and why are they important? (5+5 = 10 Marks)
Ans 1.
Definition of a Project
A project is a short-term specific, distinctive, and goal-driven project that is undertaken in order to develop an item (service, product, or result). According to the Project Management Institute (PMI) the definition of a project can be described as an ongoing effort to create a unique result, product, or service. the result. This is a distinction from continuous operations Projects have a
MUJ
Its Half solved only
Buy Complete assignment from us
Price – 190/ assignment
MUJ Manipal University Complete SolvedAssignments JAN- FEB 2026
buy cheap assignment help online from us easily
we are here to help you with the best and cheap help
Contact No – 8791514139 (WhatsApp)
OR
Mail us-Â [email protected]
Our website – https://muj.assignmentsupport.in/
JAN-FEB 2026
Â
Q.2. a) Describe the procedure for calculating Earliest Time (TE) and Latest Time (TL) for each activity in a CPM network. b) What is float or slack time, and how is it calculated? (5+5 = 10 Marks)
Ans 2.
- a) Calculating Earliest Time (TE) and Latest Time (TL) in CPM
Critical Path Method (CPM) Critical Path Method (CPM) is a network-based scheduling technique which identifies the pattern of tasks that determine the minimal amount of time needed to complete the project. Calculating Earliest Time (TE) and The Latest Time (TL) in relation to each node or event is fundamental for CPM analysis.
Earliest Time (TE) — Forward Pass: TE is the earliest possible timing that an event may be
Â
Â
Q.3. What are the key components, applications, and benefits of Management Operating System Technique (MOST)? (5+5 = 10 Marks)
Ans 3.
Key Components of MOST
The Maynard Operation Sequence Technique (MOST) is an automated motion timing system employed in the field of industrial engineering and measuring work that helps analyse and regulate the time it takes to carry out manual work tasks. MOST was created by Kjell Zandin from H.B. Maynard and Company in 1972 as a quicker, more simple alternative to older systems
Â
Assignment Set – 2
Â
Q.4. What are the two scheduling modes available in Microsoft Project? (10 Marks)
Ans 4.
Microsoft Project provides two fundamentally distinct scheduling modes. They determine the method by which it calculates tasks’ end and start dates in response to changes in the project plan. Picking the correct scheduling mode for each task is an important decision to configure that affects the efficacy and flexibility of the project program.
- Auto-Scheduled Mode
In the Auto-Scheduled Mode, Microsoft Project automatically calculates and updates the start
Â
Â
Q.5. What are the four types of dependency links, and how do they work? (5+5 = 10 Marks)
Ans 5.
For project planning, specifically using tools such as Microsoft Project and CPM-based network analysis and dependency links (also called task relationships or logical relations) establish the constraints on sequencing for project work. A dependency specifies how the start or finish of a particular task (the successor) has to do with the commencement or finish of another task (the preceding task). The four types of dependency recognised from the Project Management Institute
Â
Â
Q.6. What is project progress tracking? How to track progress in MS Project? (5+5 = 10 Marks)
Ans 6.
Project Progress Tracking
Tracking progress on projects is the system of measuring the, logging, and comparing actual project performance against the pre-approved project baseline which is the initial approved duration, scope, and cost — to assess whether the project is moving forward and identify any deviations that require corrective action. Tracking progress helps answer fundamental
Related products
-

DBB1114 MICROECONOMICS JAN FEB 2026
₹190.00 Add to cart Buy now -

DMBA119 MARKETING MANAGEMENT JAN FEB 2026
₹190.00 Add to cart Buy now -
Sale!

DMBA217 MANAGEMENT ACCOUNTING JAN FEB 2026
₹200.00Original price was: ₹200.00.₹190.00Current price is: ₹190.00. Add to cart Buy now -
Sale!

DCA6210 COMPUTER ARCHITECTURE JAN FEB 2026
₹200.00Original price was: ₹200.00.₹190.00Current price is: ₹190.00. Add to cart Buy now
